Coordinator · Doing the work
Plan work on the board
Plan in the Plan view, then do the work on the Board.
Choose the right kind of item
| Type | Use it for |
|---|---|
| Story | Something a person needs. It stays true after the work is done. |
| Task | A piece of work that finishes, such as writing a report or getting an answer. |
| Bug | Something that was built and does not work as it should. |
Write the title so a colleague understands it without asking you. Put the detail in the description, which accepts Markdown.
Decide what matters in the Plan view
Click Plan. Every open item sits on a five-by-five grid by its value and its effort:
| Low effort | High effort | |
|---|---|---|
| High value | Quick Wins: do these first | Big Bets: worth planning |
| Low value | Fill-ins: when there is a gap | Avoid: ask why they are here |
Drag items within a cell to put the most important first. If an item lands in the wrong place, open it and change its value or effort.
Move work across the board
| Column | Means |
|---|---|
| Backlog | Captured, not ready yet |
| To Do | Ready to pick up |
| Blocked | Stopped by something outside your control |
| In Progress | Someone is on it |
| Review | Finished, waiting for a person to check it |
| Done | Checked and closed |
Drag a card to move it, or drag it within a column to reorder. When something stops you, move the item to Blocked and say why: the items it is waiting on in Blocked By, or a short reason.
If you delete something by mistake
Open Manage → Trash and restore it.